St. Luke’s Meridian Medical Center

Retro-Commissioning

St. Luke’s Meridian Medical Center

Location

MERIDIAN, IDAHO

Square Feet

540,000

Per Day

$600 SAVED

Completion Date

2016

St. Luke’s Meridian Medical Center was seeking innovative ways to lower their operating costs and reduce their energy consumption. Their utility provider offered an incentive that would reimburse up to 70% of an energy conservation project’s cost if they could demonstrate a high level of savings.

The hospital engaged ENFRA to update their building control system and provide retro-commissioning of the mechanical systems. During implementation, our team worked with the hospital’s maintenance staff to update terminal unit programming and trained them on how to sustain the project’s savings.

The results were tracked through regular measurement and verification reporting which showed nearly $600 per day in cost savings. The savings, coupled with the utility rebate, made the project cash flow positive in less than 6 months.

Sutter Health Eden Medical Center

Sutter Health Eden Medical Center

St. Jude Children's Research Hospital

St. Jude Children's Research Hospital Tower II