Our Lady of the Lake

Energy-as-a-Service

Our Lady of the Lake

Location

BATON ROUGE, LA

Square Feet

1,400,000

Project Cost

$32 MILLION

Annual Energy Savings

$2.5 MILLION

Our Lady of the Lake chose to partner with ENFRA for a long-term Energy-as-a-Service partnership, designed to improve the hospital’s energy infrastructure. The project consisted of effectively replacing-in-place the hospital’s main central utility plants, interconnecting disparate central utility plants, and upgrading building automation system and controls within the hospital buildings and central plants.

The 20-year agreement includes financing of the project and on-going operation and maintenance of the central energy plants. ENFRA is also providing an energy savings guarantee for years three, four, and five of the project to mitigate the risk of savings degradation. ENFRA is ensuring sustainable savings for the life of the contract through operator training, measurement and verification, and remote support services. Construction was completed in the fall of 2019, and the project is generating $2.5 million in annual savings, well above the $2.1 million savings guarantee.

Premier Medical Plaza Natural State Labs

Premier Medical Plaza Natural State Labs

Our Lady of Lourdes Emergency Center

Our Lady of Lourdes Emergency Center